Procedures and Design Criteria for Storm Water Management Systems and Soil Erosion and Sedimentation Control Program

Protecting Livingston County’s Headwater Streams
Rules of the Livingston County Drain Commissioner

The document Procedures and Design Criteria for Storm Water Management Systems and Soil Erosion and Sedimentation Control Program represents the culmination of a two year long effort on behalf of the Drain Commissioner to revise drainage standards first adopted in 1981. This document is under revision so it may change without notice until this disclaimer is removed from the site.  However it may be used as a general guide.  Please check with the Drain Commissioner's office before you make any decisions based on this document.

TECHNICAL ADVISORY COMMITTEE

INTRODUCTION
   Impacts of Development on Water Resources
   Framework for the Design of Stormwater Management Systems
  
The Role of the Livingston County Drain Commissioner

Part A: Procedures and Design Criteria for Stormwater Management Systems
   SECTION 1 - PROCEDURES FOR PLAN SUBMISSION AND REVIEW
   SECTION 2 - PROCEDURES AND DESIGN CRITERIA FOR STORMWATER MANAGEMENT SYSTEMS

Part B: Administrative Policy, Soil Erosion & Sedimentation Control - All Sections
   Additional Information

Part C: Soil Erosion and Sedimentation Control Ordinance - All Sections

REFERENCES  -  DEFINITIONS  

Appendices

Appendix A: Section 433 Agreement Package
Appendix B: Preliminary Plat or Plan Checklist
Appendix C: Fee Schedule REVIEW FEES
Appendix D: Construction Plan Checklist
Appendix E: Hydrograph Methods
Appendix F: U.S. Soil Conservation Type II Storms
Appendix G: Livingston County Soil Types
Appendix H: Suggested Best Management Practices Schematics
Appendix I: A Simple Method of Detention Basin Design
Appendix J: Storm Conveyance Design Parameters
Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix L: Storm Drain Backfill Detail

All PDF files on this site require Adobe Acrobat Reader to view.


Drain Commissioner email: eMail the Drain Commission Office
East Complex 2300 E. Grand River Avenue  Suit 105| Howell, MI 48843
Phone 517.546.0040 | Fax 517.545.9658

Home | County Home | Phase II | Title Companies | Drainage Systems | Commercial & Homeowners | About Us | Septage | Calendar

Can't find what you are looking for?   Need to ask a question?

Problem with the site?    Contact the Webmaster

Last updated:  Tuesday, April 10, 2012  Updated by:  D. Gregor